Vertiv are the largest manufacturer of electrical switchgear in UK and Ireland. Their own brand electrical busbar, Powerbar has been so successful the brand name has come into common usage to describe the category.

The company continues to innovate and have become the first in their sector to achieve the new BSI kitemark for BIM. BS 8541 which is a great advantage to their clients who can select and customise their products at an early design stage for faster build times and cost efficiency.

Vertiv differentiate themselves in that they produce all components needed for their products in-house. In their new plant in Letterkenny, they have developed a new production line for the manufacture of 15m modular steel frame buildings which required a bespoke welding fume extraction system.

Long Reach Weld Fume LEV Extraction Needed

BEAM were invited to quote for the new weld fume LEV system for the production line. Working with the client, BEAM LEV engineers developed a solution to meet the client’s brief;

  • Long range LEV extract arms were needed to cover large-scale production bays.
  • Ease of operation and ability to fold the LEV arms was required to facilitate overhead crane access.
  • With energy efficiency a priority, Smart controls were needed.
  • Full automatic start/stop and variable speed control of the extract fans was requested.
20231107 174940 cropped

We considered several options for our new welding fume LEV System but BEAM stood out due to the excellent references they provided. They made suggestions on the design of the system to integrate with our production which demonstrated their ownership of the installation and wanted the best for us. We adopted their advice and the installation has proven to be the best outcome we could have had.”

Conor McNulty
Senior Fabrication Engineer

Class-Leading Double Articulated LEV Weld Fume Arms

BEAM's proposal exceeded the client’s minimum requirements, and we were delighted to be selected for this prestigious client. The specification of our weld fume LEV system was as follows;

  • Super long-reach 9m double articulated extract arms with bearing joints for user convenience.
  • Gas-strut balanced extract arms with range of horizontal movement from 0m – 9m, and vertical reach up to 4m to accommodate the client’s large scale steel fabrication.
  • Beam provided our unique Smart sockets whereby the welders are plugged in, and a start signal for the LEV extraction is generated when an arc is struck. This avoided the need for external wiring for current or optical sensors.
  • Linked to a VSD and fast motor dampers, the system is “fully automatic” and provides LEV extraction to where and when it is needed with potential for up to 70% energy savings compared to industry norms.

Smart Controls for Future-Proofed Energy-Efficiency

  • BEAM's unique Smart controls ensure that extraction is only provided where and when it is needed – matching the energy demand to actual requirement in real time.
  • Operating costs are optimised.
  • Fully automatic system which does not require any operator input.
  • Heat loss is minimised.
  • The Smart LEV system is a positive contributor to the whole building efficiency.
Smart Socket provides start signal and overrun timer for the fast 24v rotor damper
Smart Socket provides start signal and overrun timer for the fast 24v rotor damper

The design of BEAM's LEV arms, the functionality of the system, and quality of the installation are all faultless. A big factor for us was the addition of the Smart controls. BEAM engineers had assured us that although the units would meet 100% use, this would rarely if ever occur and we would gain substantial cost savings with the Smart controls.”

Conor McNulty
Senior Fabrication Engineer

Streamlined Installation Ahead of Schedule

Ahead of the installation, the client had prepared the mounting steelwork for the arms which allowed BEAM installation engineers to complete the project ahead of the scheduled date. This was followed by the commissioning and demonstration and hand over to enable the system to go into production as quickly as possible.

Our experience after 12 months of use has confirmed BEAM's advice to be correct and we at Vertiv are very satisfied to have selected BEAM and are happy to recommend them to others considering LEV systems.”

Conor McNulty
Senior Fabrication Engineer

BEAM lev weld fume arm installed BEAM weld fume arm at Vertiv

Talk to a Beam expert today!

Our dedicated team of experts are available to answer any queries you may have.

Proven expert logo